Chapter 1 Introduction / 1
1.1 Significance and characteristics of railway transportation organization / 2
1.2 Basic principles of railway transport organization / 5
1.3 Development trend of railway transportation organization / 8
Chapter 2 Organization of Railway Passenger Flow / 11
2.1 Connotation of railway passenger flow / 11
2.2 Railway passenger flow statistics / 12
2.3 Railway passenger flow survey / 17
2.4 Railway passenger flow forecast / 23
2.5 Railway passenger flow plan / 28
Chapter 3 Organization of Railway Freight Flow / 32
3.1 Railway transport freight / 32
3.2 The classification and condition of railway freight transport / 36
3.3 Organization of railway freight transport plan operation / 40
3.4 Railway freight delivery operation organization / 44
3.5 In-transit operation organization of railway freight / 49
3.6 Arrival operation organization of rail freight / 53
Chapter 4 Organization of Passenger Trains / 56
4.1 Overview of passenger trains / 56
4.2 Organizational mode of passenger train transportation / 60
4.3 Reasonable departure time range of trains / 61
4.4 Train stop scheme / 66
4.5 Line planning / 68
Chapter 5 Organization of Wagon Flow / 77
5.1 The overview of organization of wagon flow / 77
5.2 Influence factors of freight train marshalling plan / 84
5.3 Marshalling organization of direct train from loading station / 90
5.4 Marshalling and organization of single group train in technical station / 96
Chapter 6 Train Operation Organization / 108
6.1 Overview of train timetable / 108
6.2 Elements of train timetabling / 118
6.3 Train timetable designing / 125
6.4 Locomotive operation organization / 132
6.5 Train set operation organization / 135
Chapter 7 Operation Organization of Station / 139
7.1 Introduction / 139
7.2 Technical operation at the technical station / 152
7.3 Station shunting operation / 158
7.4 Vehicle accumulation process / 162
References / 164