Details
In 2010, China's cost-effective to consolidate and expand the response to the results of the international financial crisis, national economic situation is generally good. National Electric Power Industry statistics reflect the national economic situation as a "Barometer", has fully proved that China's macro-economic rebound to the good for the stable and rapid development momentum, with all levels of government regulation and scientific decision-making, production and operation of power enterprises to develop and essential to the construction of standard an important basis for the promotion of sustainable socio-economic development process and power industries play an important role. "Analysis of China's power industry statistics 2011," drawing on years of experience writing in a comprehensive analysis of 2010 annual statistical power industry on the basis of data from the "Eleventh Five-Year" development point of view, an increase of the "Eleventh Five-Year" period and the country region, the provinces power grid construction and investment, power generation production run, power supply and consumption, energy conservation and other electricity-related in-depth analysis, fully reflect the "Eleventh five-Year" period, the law of China's power industry development and trends, more better serve the business, service industries, government service, serving the community. "Analysis of China's power industry statistics 2011" data-rich, comprehensive, in-depth analysis, clear and intuitive charts, government departments at all levels, the majority of electricity companies, overseas investment institutions, Institute of Economic Research, library and information sector, banking, securities , consulting, equipment manufacturing, research institutes, universities and other units to a comprehensive understanding of 2010 and "during" the development of the country's electricity authority of information industry, government departments, power companies develop strategic planning, implementation of business the standard management of important reference materials and reference books.
Table of Contents
The first part of the power engineering construction investment
Chapter 1 power project investment
First, the general situation of a country
First, the investment sub-regional Power 5
Second, investment in 12 provincial power
Chapter 20 Power Construction
First, the infrastructure capacity of new generating equipment 20
First, new construction and power projects under construction 37
The second part of the network construction investment
Chapter 49 power project investment
First, the general situation of the country 49
First, investment in 51 sub-regional power grid
Chapter 54 grid construction
A new scale of 54 national
A new sub-regional scale of 55
The third part of the electricity production
Chapter 61 Power Generating Equipment
First, the national power generation capacity of 61
A sub-regional, 68 provincial power equipment capacity
Second, shut down (including retired) generator 81
Chapter 83 Power production
First, the general situation of the country 83
A sub-regional power production 89
Second, the provincial electric power production 91
Chapter 97 production plants and heating equipment
First, the power plant capacity of 97 heating equipment
First, the power plant for heat 98
Chapter 100 of thermal power production and consumption of coal
First, the overall 100
A sub-province of 101
Chapter V the average utilization hours of generating equipment 104
First, the general situation of the country 104
A sub-regional situation 104
Second, the provincial average utilization hours of generating equipment 1 08
Chapter VI power production energy saving 112
First, the consumption rate of 112 power plants
First, the standard coal consumption 115
Chapter VII of 6000 kilowatts and above the national generator set 118
A stand-alone capacity of 118
First, the production of thermal power generators to run economic and technical indicators statistical sampling 125
Chapter 1 28 power plants
First, one million kilowatts and over 128 power plants
A large-scale power generation enterprises 131
Part IV for electricity production
Chapter 1 45 the whole society electricity consumption
First, the general situation of the country 145
Second, the sub-province of 156
Chapter II system calls made by the electric power and maximum power 168
First, the general situation of the country 168
Second, the grid area of 1 69
Third, the main provincial grid of 170
Chapter 1 74 power load characteristics
First, the average electricity consumption load rate 174
Second, the daily maximum peak slip 175
Third, the average daily electricity consumption of 177
Fourth, the highest hair, electric load 178
Chapter and send electricity into 180 by
One, and sent into the provinces by the power 180
Second, cross-regional power transmission of 184
Third, the region "west to east" of 185
Fourth, the inside and outside the power exchange 187
Chapter V power supply 188
First, the power supply 188
Second, the line loss rate of 189
Third, the supply capacity of 192
Fourth, the development capacity of more than 195 electrical equipment
Attachment
Annex 1 in 2010 put into focus the new thermal power project tables 197
Annex 2 from 2006 to 2010 the national power generation capacity of the provinces Statistics 198
Annex 3 from 2006 to 2010 the national capacity of the provinces Statistics 199 hydropower equipment
Annex 4 from 2006 to 2010 across the country provinces of thermal power equipment capacity tables 200
Annex 5 from 2006 to 2010 the provinces and the national wind power installed capacity tables 201
Annex 6 from 2006 to 2010 National Statistics generating capacity in the provinces 202
Annex 7 from 2006 to 2010 the national water and electricity generating capacity of the provinces Statistics 203
Annex 8 from 2006 to 2010 the national thermal power generating capacity of the provinces Statistics 204
Annex 9 from 2006 to 2010 the provinces and the national network of wind power generating capacity of 205 tables
Accessories 102 006 - 2010 6000 kilowatts and provinces across the country for more than 206 power plants consume coal statistics
Accessories 112 006 to 2010 provinces across the country for more than 6000 kilowatts and heating power consumption of 207 coal statistics
Attachment 1 2 2006 to 2010 the provinces power generation equipment using the National Statistics 208 hours
Accessories 132 006 to 2010 provinces across the country for more than 6000 kilowatts and power plant power plant power consumption rate tables 209
Accessories 142 006 to 2010 provinces across the country for more than 6000 kilowatts and standard coal power plant power generation and supply statistics 21 0
Accessories 152,010 year part of a large power generation companies and power generation capacity tables 211
Accessories 162 010 in the whole society with the power classification tables 212
Accessories 172 006 to 2010 across the country provinces of the total electricity consumption tables 215
Accessories 182 006 to 2010 provinces across the country the first industrial power tables 216
Accessories 192 006 to 2010 provinces across the country the second industrial power tables 217
2006 to 2010 Annex 20 provinces across the country the third industrial power tables 218
2006 to 2010 Annex 21 provinces in urban and rural residents across the country electricity consumption tables 219
Annex 22 from 2006 to 2010 across the country provinces of industrial electricity consumption tables 220
Annex 23 from 2006 to 2010 electricity consumption in the country provinces of Light Industry Statistics 221
Annex 24 from 2006 to 2010 across the country provinces heavy consumption tables 222
2006 to 2010 Annex 25 provinces across the country the average rate of electricity load tables 223
Annex 26 from 2006 to 2010 the provinces of the country's largest peak slip on 224 tables
Accessories 272 006 to 2010 statistics the national inter-regional power transmission 225