The oil-gas conductor is the key part that connects subsea facilities and offshore equipment. The installation, construction and the stability control in subsequent
operation of the conductor are main technical problems in the field of off shore oil and gas engineering.The book focuses on installation of oil and gas conductor in the offshore oil field. It includes three parts. The first part introduces the main installations and structural features of the wellhead above water and the wellhead under water. Then, it summarizes methods and theories of oil and gas conductor design. Finally, the differences in the construction techniques and supporting equipment of the three oil and gas well conductor installation methods are systematically described.This book contains a complete set of equipment, construction process and design methods for oil and gas conductor installation with multidisciplinary knowledge of geotechnical engineering, civil engineering, and structural dynamics. Scientific researchers and college students engaged in marine oil and gas engineering, petroleum engineering, marine engineering will find this book as a valuable reference.
Table of Contents
1 Functions of the Oil-Gas Well Conductor and Wellhead Structure
1.1 Functions of Oil-Gas Well Conductor
1.1.1 Functions of Exploration Well Conductor
1.1.2 Functions of Development Well Conductor
1.2 Oil-Gas Wellhead Structure
1.2.1 Conductor Structure of the Wellhead Above the Sea
1.2.2 Conductor Structure of Subsea Wellhead
1.3 Common Oil-Gas Wellhead Equipment
1.3.1 Technical Requirements of Wellhead Equipment
1.3.2 Common Wellhead Equipment
References
2 Drilling-In Installation of Oil-Gas Well Conductor
2.1 Drilling-In Installation of Conductor
2.1.1 Drilling-In Construction Method of Conductor
2.1.2 Conductor Construction Method for Wellhead Above the Sea
2.1.3 Precautions for Construction
2.2 Main Equipment
2.2.1 Driving System
2.2.2 Rotating System
2.2.3 Hoisting System
2.2.4 Wellhead and Downhole Tools
2.3 Suitable Conductor Setting Depth Design
2.3.1 Load Analysis of Oil-Gas Well Conductor
2.3.2 Calculation Models of Conductor Bottom Ultimate Bearing Capacity
2.3.3 Calculation Models of Conductor's Lateral Friction of Oil-Gas Well Conductor
2.3.4 Calculation of Suitable Conductor Setting Depth
2.4 Application Case Analysis
2.4.1 Oil Field Base Information
2.4.2 Suitable Depth Below Mud Line Design of Oil-Gas Well Conductor
2.4.3 Check Analysis of Conductor Stability
References
3 Piling Installation of Oil-Gas Well Conductor
3.1 Piling Installation Technology of Conductor
3.1.1 Piling Construction Technology
3.1.2 Precautions for Construction
3.2 Main Equipments
3.2.1 Piling Equipments
3.2.2 Lifting Equipment
3.2.3 Conductor Shoe
3.3 Reasonable Setting Depth Design
3.3.1 Load Analysis of Oil-Gas Well Conductor
3.3.2 Calculation of Conductor Bottom Ultimate Bearing Capacity
3.3.3 Calculation of Pile Driving Resistance
3.3.4 Calculation of Conductor Setting Depth
3.3.5 Calculation of Penetration Length
3.3.6 Calculation Model of Hammering Number
3.4 Application Case Study
3.4.1 Basic Information of Oil Field
3.4.2 Design of Depth of Conductor into Mud
3.4.3 Check and Analysis of Conductor Stability
3.4.4 Selection of Pile Hammer
References
4 Jetting Installation Method of Oil-Gas Well Conductor
4.1 Jetting Installation Method of Conductor
4.1.1 Jetting Construction Method
4.1.2 Precautions for Jetting Installation
4.2 Main Equipment
4.2.1 Driving System and Drill String
4.2.2 CADA Tool
4.3 Design of the Setting Depth of Conductor
4.3.1 Load Analysis of the Conductor
4.3.2 Calculation of Bearing Capacity of Conductor
4.3.3 Calculation Method of the Setting Depth of Conductor
4.4 Optimal Design of Jetting Installation of Conductor
4.4.1 Optimal Design of Jetting Drilling Pressure
4.4.2 Design of Jetting Displacement
4.4.3 Design of Bit Protrusion
4.4.4 Determination of Release Waiting Time-Window
4.5 Application Case Analysis
4.5.1 The Ultimate and Real-Time Bearing Capacity of Conductor
4.5.2 Safe Depth of Conductor into Mud in Jetting Installation Method
4.5.3 Safe Waiting Time of Surface Conductor
References
5 Adaptability of Installation Method of Offshore Conductors
5.1 Technical Adaptability of Drilling-In Installation Method of Conductor
5.2 Technical Adaptability of Piling Installation Method of Conductor
5.3 Technical Adaptability of Jetting-Down Installation Method of Conductor
Sample Pages Preview
Installation Methods of Offshore Oil-Gas Well Conductor